Work scope clarifications…
UTILITIES RELOCATION (excluded):
• Sewer / Septic Tanks
• Water / Gas
• Electric / Cable / Phone
(Power Overhead, Underground, Main Panel Up-sizing)
• Water / Gas
• Electric / Cable / Phone
(Power Overhead, Underground, Main Panel Up-sizing)
REMOVING OBSTACLES (excluded):
• Trees /Concrete/Awnings
• Sheds/Site Debris/Patio Covers
OWNERS RESPONSIBILITIES:
• Neighbor access, and fence reconstruction
• Reconstruction of fencing / gates
• All property lines relating to accuracy
• Homeowner’s Association (HOA) approval
• Architectural Review Committee (ARC) approval
• Approval of pool’s dimensional layout (length, depth, width)
• Water Curing Gunite 3-times per day for 10-days after Gunite
• Plaster brushing 3-times per day for first week after plastering
• Yard drainage
• Continuous site power supply
• Continuous site water supply
• Water quality that is acceptable for filling the pool
• Maintaining a “non-stop” water supply after plaster until pool is filled.
• Door Alarm Installation
• Pavement and Street Cleaning
• Hoses for filling pool
• Damage and repairs (drains, plants, concrete in path of travel)
• Scheduling on-site availability for Pre-Plaster Inspection
• Scheduling on-site availability for Pre-Final Inspection
• Hard Dig / Rock excavation requiring additional equipment
• Expansive soil conditions
• Travel Distance (when beyond a 50 mile range from Rocklin, CA)
• Limited Access (Less than 6’-6” distance)
• De-watering due to high ground water
• Equipment location beyond allowance
• Utility run beyond allowance
• Hazardous soil (Asbestos, Arsenic, etc.)
• Continuous site water supply
Acknowledgment:________________________________
Signature Date:_________________
Dynamic Poolscapes Inc. CSL# 626207 4120 Douglas Bl., Suite 404, Granite Bay, CA 95746 (916) 630-7665